Warning: Parameter 2 to qtranxf_postsFilter() expected to be a reference, value given in /home/customer/www/intelmec.com/public_html/wp-includes/class-wp-hook.php on line 308
www.intelmec.com | Pumping of wáter mine
logo
Descubre nuestro último proyecto destacado:
www.intelmec.com | Pumping of wáter mine
163
portfolio_page-template-default,single,single-portfolio_page,postid-163,cookies-not-set,ajax_fade,page_not_loaded,,qode-title-hidden,side_menu_slide_from_right,qode-theme-ver-10.0,wpb-js-composer js-comp-ver-4.12,vc_responsive
Proyecto

Bombeo de mina

Date
Category
Hidraúlica
About This Project

Detachable pumping system for the controlled flooding of an open pit mining operation.

After the completion of the extractive activity requires the environmental recovery of the cut. It is chosen to flood the same for the creation of a natural water reservoir or artificial lake.

A pumping system is designed and constructed to maintain progressive water levels, to verify the heavy metal content of the same. The installation allows lower levels to be recovered if the water quality is still not satisfactory.

Several terraced dykes are constructed at the desired height levels.